Installation

How to Install our Flooring

Important Information

Packaged must be acclimated a minimum of 24 to 48 hours prior to installation in the room where installation will take place.

In Rooms larger than 10 x 10m (100m^2), the flooring must be installed in smaller sections with expansion joints.

Never Install Very heavy pieces of furniture such as kitchen islands/cabinets on top of the flooring.

The indoor climate should have a temperature between 12-35C and relative air humidity between 30%-60%.

Always follow the floor manufactures requirement and specifications regarding subfloor preparation.

First plank, First row

Place a spacer with predicted thickness to the left and position the panel against the wall. Later, after 3 rows, you can easily position the flooring against the front wall with predicted spacers

Second Plank First Row

Press the short end of the next plank at an angle to the first one, then fold down. Complete the first row in the same way

End of First Row

At the end of the first row, put a distance 1/4” , to the wall and measure the length of the last plank to fit. Cut the last panel to correct length, recommended min length is two times the width of the plank.

Starting the Second Row

Position the remaining part of the first row’s last plank as first plank of second row. Keep again two times the width as min length. Put a distance against the wall.

Staggering Joints

Distances between short ends. Minimum distance between short ends of planks in parallel rows shall not be less than about two times the width of the plank.

Second Row

Place the plank and angle against the plank in the previous row, press forward and fold down at the same time. Leave the plank in a somewhat up angled position when the planks start to lock. To make this further easier, a wedge with the suitable angle can be placed under the plank near the short side joint as support.

Second Plank, Second Row

Place the short end of the plank at an angle against the previous installed plank and fold down all the way.

Second Plank, Second Row

Push to slide the plank against the row in front so it aligns with the first plank. Put it down like the first plank positioned tightly together. The first/previous plank can now be folded completely down to horizontal position and if a wedge is used it can be moved to the next short end joint.

Keep the Distance

After 2-3 rows. Adjust the distance to the front wall by placing distances. Keep the distance in position during the entire time of installation and remove once the installation is completed.

Last Row (and perhaps the first row)

Minimum width 50mm Place a spacer to the wall before measuring. Make a simple drawing tool (piece of wood with a hole) and mark the panel along the wall. Cut the panels lengthwise including the flexible tongues.

Installation Around Radiator / Heating Pipes

Drill holes two times larger than the diameter of the pepes. Remove a piece of the panel with a utility knife. Put the panel on one side of the pipes and the removed piece on the other side

Installation When Angling is not possible

Remove the vertical locking part of the strip with a chisel, put applicable glue on the strip and push the panels horizontally together. Place some spacers between last board and the wall

Learn More

Our Process

Our Story

Our Flooring

Our Responsibility

Our Distributors

Installation

Easy to Install

Installing our luxury vinyl flooring is a hassle-free experience, thanks to its innovative click-lock edge design. Whether you’re a seasoned DIY enthusiast or a professional in the flooring industry, our flooring system is crafted to save you time and effort, ensuring a seamless installation process.

How to Install Our Flooring

Install Instructions

Important Information

  • Packaged must be acclimated a minimum of 24 to 48 hours prior to installation in the room where installation will take place
  • In Rooms larger than 10 x 10m (100m^2), the flooring must be installed in smaller sections with expansion joints
  • Never Install Very heavy pieces of furniture such as kitchen islands/cabinets on top of the flooring
  • The indoor climate should have a temperature between 12-35C and relative air humidity between 30%-60%
  • Always follow the floor manufactures requirement and specifications regarding subfloor preparation

Tools Needed:

  • Tape measure
  • Moisture meter (wood / concrete)
  • Circular saw or hand saw
  • Pull bar
  • Safety equipment (goggles & mask)
  • Utility knife
  • 1/4” spacers
  • Broom

First plank, First row

Place a spacer with predicted thickness to the left and position the panel against the wall. Later, after 3 rows, you can easily position the flooring against the front wall with predicted spacers

Second Plank First Row

Press the short end of the next plank at an angle to the first one, then fold down. Complete the first row in the same way

End of First Row

At the end of the first row, put a distance 1/4” , to the wall and measure the length of the last plank to fit. Cut the last panel to correct length, recommended min length is two times the width of the plank.

Starting the Second Row

Position the remaining part of the first row’s last plank as first plank of second row. Keep again two times the width as min length. Put a distance against the wall.

Staggering Joints

Distances between short ends. Minimum distance between short ends of planks in parallel rows shall not be less than about two times the width of the plank.

Second Row

Place the plank and angle against the plank in the previous row, press forward and fold down at the same time. Leave the plank in a somewhat up angled position when the planks start to lock. To make this further easier, a wedge with the suitable angle can be placed under the plank near the short side joint as support.

Second Plank, Second Row

Place the short end of the plank at an angle against the previous installed plank and fold down all the way.

Second Plank, Second Row

Push to slide the plank against the row in front so it aligns with the first plank. Put it down like the first plank positioned tightly together. The first/previous plank can now be folded completely down to horizontal position and if a wedge is used it can be moved to the next short end joint.

Keep the Distance

After 2-3 rows. Adjust the distance to the front wall by placing distances. Keep the distance in position during the entire time of installation and remove once the installation is completed.

Last Row (and perhaps the first row)

Minimum width 50mm Place a spacer to the wall before measuring. Make a simple drawing tool (piece of wood with a hole) and mark the panel along the wall. Cut the panels lengthwise including the flexible tongues.

Installation Around Radiator / Heathing Pipes

Drill holes two times larger than the diameter of the pepes. Remove a piece of the panel with a utility knife. Put the panel on one side of the pipes and the removed piece on the other side

Installation When Angling is not possible

Remove the vertical locking part of the strip with a chisel, put applicable glue on the strip and push the panels horizontally together. Place some spacers between last board and the wall

Come Visit

Visit our warehouse to view and learn about our LVP Flooring options!

Or Contact Us Directly

Give Us a Call

(919) 628-4789

Send Us an Email

trianglenc@casediscountflooring.com

Book A Free Consultation

Schedule a Time to Meet

Send Us A Message

Have a question? We would love to hear from you!

C.A.S.E. Discount Flooring

C.A.S.E. Discount Flooring is dedicated to providing a great selection of top quality LVP flooring at discount pricing with personal service.

Connect with Us

Copyright © 2023 C.A.S.E. Discount Flooring